01 — Greenfield Build
Mvikas Renewable Energy — Built Ground Up
Plant Head · End-to-end commissioning · Feb 2026 — Present
Set up India's bamboo crash barrier manufacturing venture from a blank site — land, plant layout, machinery, hiring, IRC accreditation and EN 1317 crash-test certification.
0 → 1
Greenfield plant commissioned
13
NHAI highway projects supplied
8
States covered
EN 1317
Crash-test certified
The brief
Started with a vacant plot and a brief: build the country's first scalable bamboo-based road safety barrier line. Bamboo as a structural roadside material had no precedent in NHAI projects, so every input — process, supplier, certification, customer — had to be created from scratch.
The approach
- 01Designed plant layout, identified machinery, hired and trained the full operations team
- 02Authored IRC accreditation dossier and shepherded EN 1317 crash-test certification
- 03Built supplier network for treated bamboo and steel componentry
- 04Onboarded NHAI and state PWD as customers across 8 states
Before / After
Drag the handle to compare

BeforeAfterFrom bare brickwork and bamboo scaffolding to a finished, painted production block — same site, same sheds, transformed end to end.