← All projects

04 — In-House Engineering

Hot Top Heating System — Pin Holes 2% → 0.05%

Designed & fabricated in-house · Plant workshop build

Designed and built a custom hot top pre-heating system from scratch in the plant workshop — replacing inconsistent hand-held burners with a uniform multi-nozzle gas array. Pin hole defects dropped from 2% to 0.05%.

2% → 0.05%

Pin hole defects

40x

Quality improvement

In-house

Designed & built

Scrap

Raw material used

The brief

Hot top heating is needed to drive out trapped moisture from the hot top before casting. If the moisture isn't fully removed, it surfaces during casting as bubbles that get trapped inside the metal — and later show up as pin hole defects in the finished product. The plant was using manual hand-held burners to heat the hot top, but the heating was never uniform — operator-dependent, patchy, and inconsistent. The result was a steady 2% pin hole rejection rate that nobody could shake.

The approach

  1. 01Designed the entire heating system from scratch — burner layout, manifold piping, flame distribution across the full hot top surface area
  2. 02Fabricated the whole assembly in the plant workshop using scrap material — frames, manifolds, support structure, everything built in-house
  3. 03Procured only the critical safety-rated components externally: NRVs (non-return valves) and the gas nozzles
  4. 04Engineered the nozzle spacing and flame pattern to deliver uniform heat across every cavity of the hot top — eliminating cold spots
  5. 05Commissioned, tuned, and rolled into regular casting cycle with operator training on ignition and shut-off sequence

What changed

DimensionBeforeAfter
Heating methodManual hand-held burnersFixed multi-nozzle gas array
Heat uniformityPatchy, operator-dependentUniform across full hot top
Pin hole defects2%0.05%
Build cost—Scrap + NRVs + nozzles only

Got a plant problem like this one?